2500/3 Flange SABS 1123
Characteristics of carbon steel flanges: 1. No fear of corrosion
2. Good smoothness
3. Convenient maintenance
4 Easy to weld
5 Durable and durable
SABS 1123 Flanges are forged, threaded, screwed or plate flanges as manufactured. These additionally vary in the face kind of the flange such as the flat face, raised face and the ring kind joint. There are one-of-a-kind practical kinds in the SANS 1123 Flanges such as socket weld ring flange, threaded ring flange, blind flange, weld neck flange, slip on flange, lap joint flange and so on. The dimensions of the flanges differ in accordance to the ASME B16.5 standard. The flanges vary in dimension from ½ inches to forty eight inches.
As an iron plate welding flange, many customers have questions about whether the quality of the iron plate welding flange is better than that of the forged welding flange. In fact, the quality of the iron plate welding flange and the quality of the forged welding flange are the same, but where can the iron plate welding flange not be guaranteed, that is, the material of the iron plate welding flange is the most unguaranteed, because in the general process, the density of the iron plate welding flange is no problem, but in the process of production, the blank of the iron plate welding flange is rarely tested, so after the production, the material of the iron plate welding flange that has not been tested cannot be guaranteed.
1. Standard: | SABS 1123 | |
2. Type: | Plate flange,Slip on,Blind,Lap Joint flange | |
3. Pressure Class: | 600/3 1000/3 1600/3 2500/3 4000/3 | |
4. Dimension: | DN10-DN600 | |
5. Surface Treament: | Anti-rust oil; Yellow paint; Black paint;Hot dip Galavnised; Zinc. | |
6. Raw Material: | carbon steel; | |
7. Packing: | Wooden Case, Pallet. | |
8. Payment: | L/C, T/T | |
9. Delivery time: | 30 ~60 days after confirm the order |
1. Standard: | SABS 1123 | |
2. Type: | Plate flange,Slip on,Blind,Lap Joint flange | |
3. Pressure Class: | 600/3 1000/3 1600/3 2500/3 4000/3 | |
4. Dimension: | DN10-DN600 | |
5. Surface Treament: | Anti-rust oil; Yellow paint; Black paint;Hot dip Galavnised; Zinc. | |
6. Raw Material: | carbon steel; | |
7. Packing: | Wooden Case, Pallet. | |
8. Payment: | L/C, T/T | |
9. Delivery time: | 30 ~60 days after confirm the order |